摘要 基于S5-13工作面过邻近F5断层应力区时出现煤壁片帮严重、顶板破碎、支架倾架等现象,为了保证工作面安全高效回采,采取了顶板预裂泄压、支设U29型工字钢棚、注浆等联合维护措施,保证了工作面安全快速过断层应力区,取得了显著成效。 When the S5-13 working face passes through the stress area adjacent to the F5 fault,there are some problems such as rib spalling on the coal wall,broken roof and tilting support.In order to ensure safe and efficient mining in working face,joint maintenance measures such as roof pre-fracturing and pressure relief,support of U29 I-shaped steel shed and grouting were adopted,which ensured safe and rapid crossing of fault stress area in working face and achieved remarkable results.
作者 杜文科 Du Wen-ke(Changcun Coal Mine,Lu'An Environmental Protection and Energy Development Co.,Ltd.,ShanxiChangzhi 046102)
出处 《山东煤炭科技》 2019年第6期25-26,31,共3页 Shandong Coal Science and Technology
关键词 综采 断层 应力区 措施 fully mechanized mining fault stress zone measures
  • 相关文献

参考文献5

二级参考文献22

共引文献30

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部