广州地铁21号线高架桥梁设计方案掠影

Design Scheme of Elevated Bridge on Guangzhou Metro Line 21
下载PDF
导出
摘要 广州地铁21号线高架段典型桥梁采用了(4×40)m单薄壁连续刚构结构,在轨道交通桥梁中颇具特点,发扬了无支座设计和排水管内敷的优点。山田站为双岛四线站,站前为4线3幅桥梁,经比选,采用了(3×30)m分幅刚构配门式墩方案。 The(4×40)m single thin-walled continuous rigid frame structure is adopted in the elevated section of Guangzhou metro line 21.It has some characteristics in the rail transit bridge,and has the advantages of no bearing design and internal drainage pipe application.Shantian Station is a double-island four-line station with three bridges in front of the station.After comparison and selection,the scheme of portal pier with(3×30)m framed rigid frame is adopted.
作者 杜洋 DU Yang(Guangzhou Metro Design & Research Institute Co. Ltd,Guangzhou 510010,China)
出处 《工程建设与设计》 2019年第13期87-88,92,共3页 Construction & Design for Engineering
关键词 轨道交通 桥梁 连续刚构桥 Y型独墩 rail transit bridge continuous rigid frame bridge Y type single pier
  • 相关文献

参考文献1

二级参考文献2

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部