期刊文献+

300MW机组锅炉可翻转暖风器的设计改造 被引量:2

The study on Air Heater Transformationscheme of 350MW Power Unit
下载PDF
导出
摘要 为了降低空预器的低温腐蚀,锅炉普遍采用设置暖风器提高空气预热器的风温手段。但随温度的提高,入口空气侧的阻力增加,锅炉效率降低。现介绍某厂2×300MW机组暖风器改造方案,并分析了方案的可行性,结果表明经过改造后暖风器停用期间的风道阻力下降,风机耗电量下降,安全效益及经济效益提高。 Currently, the installation of boiler air heater can improve primary air and secondary air temperature of air preheater, reduce the low temperature corrosion of air preheater heating surface, but with the increase of temperature, the inlet air side resistance increases and the boiler efficiency decreases. This paper introduces air heater transformation scheme of 2×300 MW power unit in a factory, and analyzes the feasibility of the scheme. The results show that the resistance of air duct during the air heater stopped down is decreased, the fan power consumption is decreased, safety and economic benefits are improved.
作者 王伟 Wang Wei(Harbin Boiler Co., Ltd., Harbin 150046 ,China)
出处 《锅炉制造》 2019年第4期13-15,共3页 Boiler Manufacturing
关键词 锅炉 暖风器 2×300MW机组 改造 Boiler Air heater 2×300MW power unit Transformation
  • 相关文献

参考文献3

二级参考文献11

共引文献5

同被引文献27

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部