摘要
以阳朔阿丽拉酒店施工为背景,该酒店细节、用料极为考究,施工工艺复杂,针对酒店中新型墙体的施工与算量、折角楼梯配模、圆锥穹顶的木纹方案等BIM技术应用难点,对施工工艺进行分解,通过采用模拟施工工艺、Dynamo算量等BIM技术,解决无构造柱组合镂空清水砖墙技术交底和工程算量难、木痕饰面清水混凝土折角楼梯配模下料难、圆锥穹顶设计施工一体化的难题,最后进行质量、安全和技术的BIM协同管理,解决复杂部位模板拼装难题,减少材料损耗、缩短工期、提升企业经济效益。
Taking Yangshuo Alila Hotel as the background, the details and materials are extremely sophisticated and the construction process is complicated. In view of the difficulties in the application of BIM technology, such as the construction and calculation of the new wall in the hotel, the formwork matching of the angular staircase, the wood grain scheme of the conical dome, the construction process is decomposed, combining with BIM technology, the simulated construction process, Dynamo calculation and other BIM technologies are adopted , to solve the difficulties in technical disclosure and engineering calculation of hollow brick wall without constructional column combination, the difficulty in material distribution of fair-faced concrete folding corner stair with wood mark finish , and the integration of cone dome design and construction. Finally, BIM collaborative management of quality, safety and technology is carried out. The problem of formwork assembly in complex parts is solved, material loss is reduced , the construction period is shortened and the enterprise economy benefit is improved.
作者
周霞
周业强
吴沛聪
ZHOU Xia;ZHOU Yeqiang;WU Peicong(Guangxi Institute of Building Research & Design,Nanning,Guangxi 530005 ,China;Guangxi Construction Engineering Group No. 1 Construction EngineeringCo.,Ltd. ,Nanning,Guangxi 530001 ,China)
出处
《施工技术》
CAS
2019年第12期23-27,共5页
Construction Technology
关键词
建筑信息模型
构造柱
混凝土
管理
施工技术
building information modeling ( BIM )
structural column
concrete
management
construction