期刊文献+

长螺旋钻孔压灌桩桩头空洞原因分析及处理

Causes Analysis and Treatments of Cavity Defect of Long Auger Drilling Pile Head
下载PDF
导出
摘要 云南省保山市某桩基工程采用长螺旋钻孔压灌桩基础,成桩后桩头出现了空洞缺陷。文章结合工程实例分析了产生桩头空洞缺陷的原因,讨论了长螺旋压灌桩施工过程中引起空洞的因素及处理措施。结果表明,桩头空洞缺陷是由成桩中产生的超空隙水压入,以及施工不当造成的,处理措施取得了良好的效果,也为今后的长螺旋钻孔压灌桩施工提供了借鉴。 A pile foundation project was built with long auger drilling pile in Baoshan in Yunnan.Later,there are cavity defects in the pile head.This paper analyzed the causes of cavity defects in pile head with engineering examples,and discussed the causes and treatment measures of cavity in the construction process of long auger drilling pile.The results show that the cavity defect of pile head is caused by the super high water pressure and improper construction,and the treatment measures have achieved good design results,which can provide a reference for the construction of long auger drilling pile in the future.
作者 程远臻 毛洪运 Cheng Yuanzhen;Mao Hongyun(Chengdu Surveying Geotechnical Research Institute Co.,Ltd.of MCC,Chengdu Sichuan 610023,China)
出处 《城市建筑》 2019年第9期157-158,共2页 Urbanism and Architecture
关键词 长螺旋压灌桩 桩头空洞缺陷 处理措施 long auger drilling pile cavity defects of pile head treatment measures
  • 相关文献

参考文献4

二级参考文献19

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部