摘要 以实际工程为例,介绍了拱梁组合体系先梁后拱施工中拱肋吊装施工的方案和计算,重点阐述了履带吊上桥对桥梁结构影响的计算。全面分析各种影响因素,并通过对重型履带吊上桥的各种荷载进行分析计算,对带支架的箱梁结构进行验算,证明了重型履带吊上桥施工方案可行。沙河大桥的成功应用,为同类型桥梁吊装施工提供了参考。 Taking the actual project for example,the scheme and calculation of the arch rib hoisting construction of the arch-beam composite system are briefly introduced,and the calculation of the impact of the crawler crane on the bridge structure is emphasized.The various influencing factors are comprehensively analyzed,the various loads of the crawler crane on the bridge are analyzed and calculated,and the box-girder structure with the bracket is checked to prove that the construction scheme of the crawler crane being on the bridge is feasible.The successful application of Shahe bridge provides a reference for similar bridge hoisting construction.
作者 李磊 王超 王永伟 Li Lei;Wang Chao;Wang Yongwei(Henan Provincial Communications Planning & Design Institute Co.,Ltd.,Zhengzhou 450002;Huanghe Science and Technology University,Zhengzhou 450002)
出处 《工程建设》 2019年第6期64-68,73,共6页 Engineering Construction
基金 河南省科技厅科技攻关项目(182102210409)
关键词 拱梁组合体系拱桥 拱肋 吊装施工 结构验算 arch-beam composite bridge arch rib hoisting construction structure check
  • 相关文献

参考文献2

二级参考文献5

共引文献6

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部