工作面初采前顶板深孔预裂爆破技术 被引量:5

Deep-hole Pre-splitting Blasting Technology of Roof before Initial Mining in Working Face
下载PDF
导出
摘要 结合具体工程实际,在分析工作面开采地质条件和相应技术条件的基础上,对预裂爆破机理和顶板预裂爆破方案做了逐一分析,并对顶板深孔预裂爆破技术的应用效果做了分析。结果表明,顶板深孔预裂爆破技术达到了预期效果,实现了对工作面空顶距离的有效控制,为生产作业的持续安全开展提供了积极的保障。 Combining with the concrete engineering practice,based on the analysis of the mining geological conditions and corresponding technical conditions of the working face,this paper analyzed the mechanism of pre-splitting blasting and the plan of roof pre-splitting blasting one by one,and analyzed the application effect of roof deep-hole pre-splitting blasting technology.The results show that roof deep-hole pre-splitting blasting technology has achieved the expected results,realized the effective control of empty roof distance of working face,and provided a positive guarantee for the sustainable and safe development of production operations.
作者 赵麒 ZHAO Qi(Dadougou Coal Industry Co.,Ltd.,Datong Coal Mine Group,Datong 037000,Shanxi,China)
出处 《能源与节能》 2019年第7期89-90,共2页 Energy and Energy Conservation
关键词 工作面 初采 顶板 深孔预裂爆破 working face initial mining roof deep-hole pre-splitting blasting
  • 相关文献

二级参考文献20

共引文献12

同被引文献46

引证文献5

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部