摘要
结合站区工程条件,对广州白云站(棠溪站)研究了新建车场按倒边分两次实施的倒边施工方案,以及在东侧设过渡车场、新建车场可整体实施的整体实施方案。对两种方案进行了工期研究及经济性分析,可为类似工程提供借鉴。
Based on the engineering conditions of the station area, this paper studies the construction plan of the new parking lot in Baiyun station(Tangxi station), and the overall implementation plan of the transitional parking lot and the new parking lot on the east side. The time limit and economic analysis of the two plans are carried out, which can provide reference for similar projects.