新建广州白云站(棠溪站)施工过渡方案研究

Study on Station Construction Transition Plan forThe newly built Guangzhou Baiyun station(Tangxi station)
下载PDF
导出
摘要 结合站区工程条件,对广州白云站(棠溪站)研究了新建车场按倒边分两次实施的倒边施工方案,以及在东侧设过渡车场、新建车场可整体实施的整体实施方案。对两种方案进行了工期研究及经济性分析,可为类似工程提供借鉴。 Based on the engineering conditions of the station area, this paper studies the construction plan of the new parking lot in Baiyun station(Tangxi station), and the overall implementation plan of the transitional parking lot and the new parking lot on the east side. The time limit and economic analysis of the two plans are carried out, which can provide reference for similar projects.
作者 朱磊 ZHU Lei(China Railway SIYUAN Survey and Design Group Co.,Ltd WuHan 430063)
出处 《铁道勘测与设计》 2019年第3期93-97,共5页 Railway Survey and Design
关键词 施工过渡 方案比选 经济性分析 The transition of construction plan comparison Economic analysis
  • 相关文献

参考文献1

二级参考文献5

  • 1CJJ75-97.城市道路绿化规划与设计规范[S].[S].,..
  • 2GB50091-2006,铁路车站及枢纽设计规范[S].
  • 3铁道部.铁路技术管理规程[M].北京:中国铁道出版社,2006.
  • 41992年6月22日国务院令第100号,城市绿化条例[S].
  • 5GB2983-2001,安全色[S].

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部