期刊文献+

压铸模大型抽芯的二次抽芯机构设计 被引量:1

Design of Secondary Core-pulling Mechanism for Large-scale Core-pulling of Die Casting Die
下载PDF
导出
摘要 针对压铸模具大型抽芯成型位投影面积大、抱紧力大以及存在液压油缸抽不出或抽芯卡死等问题,设计了一种液压油缸与楔紧块结合的二次抽芯机构。首先利用开模力推动楔紧块,实现抽芯第一次抽出;然后利用液压油缸,实现第二次抽出,此种机构保证了大型抽芯作业连续性。 Aiming at the problems of large projection area,large holding force and the problem that the hydraulic cylinder can not be pumped out or the core is stuck, the secondary core-pulling mechanism combined with the hydraulic cylinder and the wedge block is designed. Firstly, the clamping force is used to push the wedge block to realize the first extraction of the core. Then the hydraulic cylinder is used to realize the second extraction.This mechanism ensures the continuity of the large core pulling operation.
作者 黄美莲 何宇云 HUANG Meilian;HE Yuyun(Guangdong Institute of Technology, Zhaoqing 526100)
机构地区 广东理工学院
出处 《现代制造技术与装备》 2019年第6期25-25,27,共2页 Modern Manufacturing Technology and Equipment
基金 广东理工学院科技项目暨“创新强校工程”(GKJ2018008)
关键词 压铸模 大型抽芯 二次抽出 die casting die large core-pulling secondary extraction
  • 相关文献

参考文献2

二级参考文献8

共引文献9

同被引文献10

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部