随着城市化建设的不断发展和劳动力资源逐渐匮乏,传统粗犷式的施工方法因资源浪费、低效,与时代发展趋势格格不入,亟需对现有的施工工法进行提升以改变目前的现状。论文以厦门市某具体项目为例,对“铝模+爬架+穿插施工”模式下的高效施工工法及控制要点作了详细的介绍。
With the continuous development of urbanization and the gradual scarcity of labor resources, the traditional construction method is incompatible with the development trend because of the waste of resources and low efficiency. It is urgent to improve the existing construction methods to change the current situation. Taking a project in Xiamen city as an example,this paper introduces in detail the efficient construction method and the controlling points under the mode of “aluminum mold with climbing frame using alternate construction”.