铁路工程总承包项目造价控制要点

Key Points of Cost Control for Railway Engineering General Contracting Projects
下载PDF
导出
摘要 铁路工程的特殊性在于建设周期长,资金运转慢,因此,必须通过工程造价进行全过程规划控制,以更科学有效的方式保证各阶段的建设效果,进而以合理的建设投资和最快的施工进度为铁路建设设立标杆,推动整个行业更快更强的发展。总承包是铁路项目合同管理的主要形式,这一形式能更好地促进工程顺利完成并有利于后期的维护经营。 The particularity of railway engineering lies in the long construction period and slow operation of funds.Therefore,it is necessary to carry out the whole process planning control through engineering cost,to ensure the construction effect of each stage in a more scientific and effective way,and then to invest in the reasonable construction and the fastest.The construction progress has set a benchmark for railway construction and promoted the faster and stronger development of the entire industry.General contracting is the main form of railway project contract management.This form can better promote the successful completion of the project and facilitate the later maintenance and operation.
作者 李智慧 Li Zhi-hui
出处 《建筑技术开发》 2019年第11期109-111,共3页 Building Technology Development
关键词 铁路 EPC合同 工程造价 railway EPC contract project cost
  • 相关文献

参考文献4

二级参考文献15

共引文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部