期刊文献+

软弱围岩隧道中管棚锁脚台阶法施工技术 被引量:4

Construction Technology of Bench Method Composed with Middle-size Pipe Shed and Foot-locked Rods in Weak Surrounding Rock Tunnel
下载PDF
导出
摘要 当前,软弱围岩隧道施工工法,一般设计施工方案为CD或CRD法施工,施工程序复杂,施工过程中围岩多次受到扰动,变形和沉降量均较大,施工安全风险大。为此,很多工程建设者都在尝试通过物理、化学手段来改良隧道围岩性质,提高围岩等级,达到优化施工工法、加快施工进度的目的。本文也是基于这种施工理念的一种尝试和创新,针对软弱围岩隧道采用的中管棚锁脚台阶法,通过注浆、锁脚锚杆等措施的组合使用,将复杂施工工法简化为上下台阶或三台阶法施工,进而提升工效。该工法目前已在多个隧道施工项目得到了成功应用,均取得了较好的应用效果。 At present, CD or CRD methods are the general design construction schemes for the weak surrounding rock tunnels.With complex construction procedure and frequent disturbance of surrounding rock during construction, large deformation and settlement and high risk of construction safety are caused.In view of the above, many engineering builders are trying to improve the surrounding rock properties and raise the grade of surrounding rock of tunnels by physical and chemical means, for the purpose of optimizing the construction method and speeding up the construction progress.This paper is also an attempt and innovation based on this construction concept.Aimed at the bench method composed with middle-size pipe shed and foot-locked rods used in weak surrounding rock tunnel, the complex construction method is simplified to the upper-lower benching tunnelling method or three-bench method for the construction to improve the work efficiency in combination with grouting, locking anchor and other measures.So far, the method has been successfully applied in many tunnel construction projects, and has achieved good application results.
作者 胡志强 Hu Zhiqiang(China Railway 11th Bureau Group 1st Engineering Co. Ltd., Xiangyang Hubei 441104, China)
出处 《铁道建筑技术》 2019年第8期89-92,共4页 Railway Construction Technology
基金 中国铁建股份有限公司科技研发计划项目(15-C06)
关键词 软弱围岩 隧道 中管棚 锁脚 台阶法 weak surrounding rock tunnel middle-size pipe shed foot-locked rod bench method
  • 相关文献

参考文献11

二级参考文献101

共引文献139

同被引文献36

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部