摘要
随着我国电力系统建设的不断完善,对10kV配网线路的改造也开展得如火如荼。在10kV配网线路改造的过程中如果不能够采取科学合理的技术措施,很容易造成10kV配网线路相互干扰,从而影响电力系统的正常运行。为此必须要加强对10kV配网线路改造的全面分析,总结10kV配网线路改造的具体施工组织设计方案,明确10kV配网线路的准备流程,对10kV配网线路的注意要点进行分析,提高10kV配网线路的整体质量,为我国电力事业的发展做出重要的贡献。
With the continuous improvement of China’s economic construction,the transformation of 10 kV distribution network lines is also in full swing.In the process of 10 kV distribution line transformation,if scientific and reasonable technical measures can not be taken,it is easy to cause 10 kV distribution line interference,affecting the normal operation of the power system.Therefore,we must actively strengthen the comprehensive analysis of 10 kV distribution network line transformation,summarize the specific construction organization design scheme of 10 kV distribution network line transformation,clarify the preparation process of 10 kV distribution network line,analyze the key points of attention of 10 kV distribution network line,improve the overall quality of 10 kV distribution network line,and develop our country’s power industry.Make an important contribution.
出处
《电力系统装备》
2019年第15期173-174,共2页
Electric Power System Equipment
关键词
10KV配网线路
改造工程
施工技术
10 kV distribution network line
renovation project
construction technology