摘要
苏通GIL综合管廊工程作为淮南-南京-上海特高压交流工程连接长江南岸与北岸的重要通道,其能否顺利建成投运,对于整个工程具有重大意义。以管廊内GIL设备安装工序为主线,从人、机、料、法、环多维度辨识、评估GIL设备运输、安装、试验等关键工序的风险,提出了针对性较强的安全防护措施。
Suzhou-Nantong gas insulation line (GIL) is looked to as a portion of Huainan-Nanjing-Shanghai Extra-High Voltage Transmission Line which is used to connect Yangtze river north bank line to south bank line. It is of great significance to the whole Transmission Line project. This paper takes the Tunnel GIL equipment installation process as the main line and from manpower, machinery, material, methodology, procedure linkage multi-dimensional identification, assesses the risk in transportation, installation and commissioning testing process of the GIL equipment. Its also puts forward its protective measures. improved the efficiency of security management of GIL equipment installation.
作者
戴挈军
刘博
董四清
陆东生
侯镭
陈松涛
李东鑫
韩鸣
DAI Qiejun;LIU bo;DONG Siqing;LU Dongsheng;HOU Lei;CHEN Songtao;LI Dongxin;HAN Ming(Jiangsu Transmission and Transformation Co., Ltd., Nanjing 210037, China;Engineering Management Department,Beijing 100052, China;State Grid Jiangsu Electric Power Co., Ltd., Nanjing 210008, China)
出处
《机械制造与自动化》
2019年第5期189-192,共4页
Machine Building & Automation
关键词
GIL安装
风险
识别
评估
gas insulation line (GIL) installation
risk
identification
assessment