BIM模式下地铁工程施工管理流程研究

Research on construction management process of subway project based on BIM
原文传递
导出
摘要 结合地铁工程施工总承包的管理需求,以青岛地铁8号线大洋站(含)—青岛北站海底隧道工程为例,建立了GIS+BIM模型,并研发了“GIS+BIM项目信息管控平台”,形成了一套BIM模式下地铁工程施工管理流程。该流程改善了施工各参与方的信息沟通方式,实现了施工智慧管控,节省了工程建设管理成本,提高了施工效率。 In combination with the management requirements of the general contracting of subway construction,and taking for example the Qingdao Metro Line 8 Dayang Station(including)-Qingdao North Station undersea tunnel project,the GIS+BIM model is established,the"GIS+BIM project information management and control platform"is developed,and a set of subway construction management processes in BIM mode are formed.The processes have improved the information communication methods of the construction participants,realized the construction intelligent management and control,saved the engineering construction management cost and improved the construction efficiency.
作者 倪晓飞 陈静茹 王跃 周东明 Ni Xiaofei;Chen Jingru;Wang Yue;Zhou Dongming(School of Civil Engineering,Qingdao University of Technology,Qingdao 266033,Shandong;Qingdao Metro Line 8 Project Headquarters of China Railway Group Limited,Qingdao 266033,Shandong)
出处 《工程建设》 2019年第9期70-74,共5页 Engineering Construction
关键词 地铁工程 GIS+BIM项目信息管控平台 施工管理流程 质量控制 进度控制 subway project GIS+BIM project information management platform construction management process quality control progress control
  • 相关文献

参考文献4

二级参考文献25

共引文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部