摘要
结合广东某商业广场案例,对软土地基管桩偏位的处理方案进行了比选分析。通过采取针对性的设计措施及施工措施,确保桩基的承载力能达到设计要求。
This paper compares and analyzes the treatment scheme of pipe pile deviation in soft soil foundation according to a case in Foshan,Guangdong province. By taking specific design measures and construction measures,we ensure that the bearing capacity of pile foundation can meet the design requirements.
作者
骆建松
Luo jiansong(Shanghai Changkai Geotechnical Engineering Co.,Ltd.,Shanghai 200093,China)
出处
《山西建筑》
2019年第19期72-73,共2页
Shanxi Architecture
关键词
软土地基
管桩偏位
纠偏加固
soft soil foundation
pipe pile deviation
deviation-rectification and reinforcement