水库大坝防渗加固设计与复核计算 被引量:6

Design and recheck calculation of seepage control and reinforcement of Shuiquanggou Reservoir dam
下载PDF
导出
摘要 新疆某水库长年带病运行,大坝防洪标准低,运行中出现渗漏,加之大坝没有护坡及溢洪道年久失修,过流能力不足,存在严重漏水现象。工程设计中,针对大坝渗漏,提出两种方案比选分析,选取黏土斜坡方案,说明该方案是合理的。 Taking a reservoir in Xinjiang as an example, due to the operation in the condition of low flood control standard all the years round, and without slope protection and spillway in disrepair, the flow ability is not enough and there are serious leakage phenomenon. This paper puts forward two scheme to analysis, the clay sloping wall scheme is reasonable.
作者 朱智元 ZHU Zhi-yuan(Water Conservancy Bureau of Qinghe, Altay Region, Qinghe 836200,China)
出处 《水科学与工程技术》 2019年第5期57-59,共3页 Water Sciences and Engineering Technology
关键词 水库防渗加固 黏土斜墙 复核计算 方案比选 seepage control and reinforcement the clay sloping wall check calculation scheme comparison
  • 相关文献

参考文献5

二级参考文献14

共引文献49

同被引文献24

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部