摘要
大跨度分步施工石拱桥 ,由于受到结构组成时序的影响 ,结构各部位的应力与变位随时都在发生变化 ;通过对世界最大跨径石拱桥——丹河大桥的施工仿真研究 ,找到了分步施工石拱桥施工仿真控制及分析方法 。
Because the method of long span fractional steps of constructing the stone arch bridge is affected by the time sequencing of forming the structure,the stress and the displacement among the structure change at any time.In this paper,the construction simulation of Danhe bridge is studied,which is the longest span stone arch bridge in the world,the construction simulation control and method of fractional steps of constructing the stone arch bridge are found,at the same time,the high stress area in arch toe is discovered.
出处
《中国公路学报》
EI
CAS
CSCD
北大核心
2002年第4期53-56,共4页
China Journal of Highway and Transport
关键词
大跨度
石拱桥
分步施工
仿真分析
stone arch bridge
fractional steps construction
simulation analysis