摘要
This paper proposes a quench protection project of HT-7U toroidal superconducting tokamak through a forced commutation analysis of DC circuit breaker (DCCB) paralleling fuse. Based on the requirement of quench protection, main parameters are selected. Experimental results demonstrate the validity of this proposed project.
This paper proposes a quench protection project of HT-7U toroidal superconducting tokamak through a forced commutation analysis of DC circuit breaker (DCCB) paralleling fuse. Based on the requirement of quench protection, main parameters are selected. Experimental results demonstrate the validity of this proposed project.
基金
This work was supported by the National Meg-science Engneering Project of the Chinese Government.