摘要
本文通过了解国内医院开展建筑设备与系统调试工作的现状,发现现存的不足,并探讨解决不足的方法。本研究于2018年10月至2018年12月,在安徽、江苏两省采用方便抽样的方法,抽取67家医疗单位进行问卷调查。问卷经查阅文献和专家咨询后自行设计,由医疗机构进行填写,数据收集完成后导入SPSS18.0进行描述性分析。调查数据显示共有67家医院参与本研究,从医院进行系统调试动因重要度、建筑设备与系统调试组织管理情况、实施情况、资料移交情况这四个维度分条目展开调查。本研究发现国内医院建筑设备与系统调试工作基本都已经展开,但在细节方面仍需重视,如:建立调试清单、调试报告、开展对建筑设计的调试等。
This paper explores the current situation of construction equipment and system commissioning work in domes tic hospitals,discovers existing deficiencies,and explores ways to solve the shortcomings.From October 2018 to Decem ber 2018,this study used 67 methods to conduct a questionnaire survey in Anhui and Jiangsu provinces using conve nient sampling methods.The questionnaire was designed by the literature and expert consultation,and was filled in by the medical institution.After the data collection was completed,SPSS18.0 was introduced for descriptive analysis.The survey data showed that a total of 67 hospitals participated in the study,and the four dimensions of the system commis sioning motivation,construction equipment and system commissioning organization management,implementation status,and data transfer were investigated.This study found that the construction of domestic hospital construction equipment and systems has basically been carried out,but still need to pay attention to the details,such as:the establishment of commissioning list,commissioning report,debugging of architectural design.
作者
查静茹
李峰
冯毅
陈明壮
鲁超
汪卓赟
ZHA Jingru;LI Feng;FENG Yi;CHEN Mingzhuang;LU Chao;WANG Zhuoyun(The Second Hospital of Anhui Medical University,Hefei 230601,China;The First Affiliated Hospital of Anhui Medical University,Hefei 230022,China;Shanghai Yizhong Gentai Group Co.,Ltd.Shanghai 200082,China)
出处
《安徽建筑大学学报》
2019年第4期92-97,共6页
Journal of Anhui Jianzhu University
基金
安徽省教育厅新工科研究与实践项目(2017xgkxm13)
关键词
医院
系统调试
现状调查
hospital
system debugging
status survey