摘要
近年来,我国水利工程开始大力推广总承包模式,很多项目采取了EPC总承包模式。由于参建各方对总承包模式的理解差异及相关体制的制约,EPC模式的优势几乎没有得到体现,往往又回到传统模式上去。本文结合FIDIC合同条款,探讨了水利工程实施EPC模式存在的问题,分析了EPC总承包模式和DB总承包模式的异同,并提出水利工程推广总承包模式应优先选择DB模式的建议,供广大水利行业建设管理者参考。
China water conservancy projects begin to vigorously promote the general contracting mode in recent years,and EPC general contracting mode is adopted in many projects.The advantages of EPC mode are almost not reflected,and it is often returned to the traditional mode due to the differences in the understanding of the general contracting mode and the constraints of relevant systems.The provisions of the FIDIC contract are combined in the paper for discussing the problems existing in the implementation of EPC mode in the water conservancy projects.The similarities and differences between EPC general contracting mode and DB general contracting mode are analyzed to put forward suggestion that DB mode should be preferred in the promotion of general contracting mode in water conservancy projects,which is used as reference by the construction managers in the vast water conservancy industry.
作者
王盟
龚秋明
WANG Meng;GONG Qiuming(Zhongshui Zhujiang Planning,Survey and Design Co.,Ltd.,Guangzhou 510610,China)
出处
《水利建设与管理》
2019年第9期64-67,47,共5页
Water Conservancy Construction and Management
关键词
FIDIC合同
EPC总承包模式
DB总承包模式
水利工程
FIDIC contract
EPC general contracting mode
DB general contracting mode
water conservancy project