摘要
高速铁路无缝线路上普遍敷设500m长钢轨。500m长钢轨焊接系统具有复杂的工艺流线,在吊运、焊接、输送等各环节均存在诸多安全隐患,易产生重大生产事故。因此,为提高500m长钢轨焊接系统的可靠性与安全性,针对钢轨焊接系统存在的安全风险,提出一种基于LEC评价法的风险评价方案,并利用本质安全理论和全寿命周期安全管理理论针对性地提出风险应对措施,为500m长钢轨焊接系统的设计、施工、设备安装、运营维护等提供参考。
The 500-meter long rail is generally laid on seamless track of high-speed railway. The 500-meter long rail welding system has a complex process flow line with many potential safety hazards in the lifting, welding, transportation and other processes, which are prone to major production accidents. In order to improve the reliability and safety of the system, a risk assessment scheme based on LEC evaluation method is proposed to tackle the safety risks of the system. Risk response measures are put forward according to the intrinsic safety theory and life cycle safety management theory so as to provide references for the design, construction, equipment installation and operation of 500-meter long rail welding system.
作者
刘辉
LIU Hui(China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China)
出处
《铁道标准设计》
北大核心
2019年第10期39-43,共5页
Railway Standard Design
基金
中国铁路总公司科研课题(YJ18141134)