期刊文献+

地铁车站基坑开挖对燃气管线技术保护措施 被引量:3

Technical Protection Measures for Gas Pipelines in Foundation Pit Excavation of Metro Stations
下载PDF
导出
摘要 福州地铁5号线吴山站地层为淤泥、黏性土等不良地质,距离基坑边DN500次高压燃气管线在基坑开挖出现沉降,存在重大安全隐患,需对管线采取悬吊保护措施,通过监测数据表明,措施能够满足施工需要,保证施工的顺利进行。 The stratum of Wushan station of Fuzhou Metro Line 5 is bad geological area such as silt and cohesive soil.The DN500 high-pressure gas pipeline from the foundation pit is subsided in the excavation of the foundation pit.There are major safety hazards,and it is necessary to take suspension protection measures for the pipeline.Through the monitoring data,the measures can meet the construction needs and ensure the smooth progress of the construction.
作者 王进先 WANG Jin-xian(PowerChina Railway Construction Co.,Ltd.,Beijing 100044,China)
出处 《价值工程》 2019年第35期174-176,共3页 Value Engineering
关键词 地铁车站 燃气管线 沉降 悬吊保护 subway station gas pipeline settlement suspension protection
  • 相关文献

参考文献3

二级参考文献14

共引文献30

同被引文献23

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部