摘要
城市老城区市政工程改造及维护项目中,旧桥检修项目位置交通拥堵且人流量大,施工环境复杂,针对上述问题,设计一种新型可调节拆分式移动挂篮,由2根支撑横梁、配重平台、施工操作平台、具有锁止功能的行走装置及吊架等部分通过焊接或栓接组成,具有制作及现场装拆施工便捷、成本低、安全可靠、装配化程度高等优点,实际应用效果良好。
In the municipal engineering reconstruction and maintenance project of the old urban area,the location of the old bridge maintenance project is congested with traffic and large flow of people,and the construction environment is complex. In view of the above problems,a new adjustable split type mobile hanging basket is designed,which is composed of two supporting beams,counterweight platform,construction operation platform,walking device with locking function and hanger,etc. by welding or bolting It has the advantages of convenient construction,low cost,safety and reliability,high degree of assembly,and good practical application effect.
作者
刘玮
陈浩
何彬
刘浩喆
钟程
LIU Wei;CHEN Hao;HE Bin;LIU Haozhe;ZHONG Cheng(China Construction Third Engineering Bureau Co.,Ltd.,Wuhan,Hubei 430064,China)
出处
《施工技术》
CAS
2019年第22期41-42,54,共3页
Construction Technology
基金
中建三局科技研发课题(CSCEC3B-2016-9)
关键词
桥梁工程
检修
维护
挂篮
bridges
inspection
maintenance
hanging basket