摘要
以乌东德水电站右岸对外交通老鹰窝特长隧道为例,研究射流风机联动方式、施工支洞作为逃生通道对火灾工况下延期流动的影响。采用火灾网络通风的计算方法研究4个防火分区分别发生火灾时隧道洞内空气流动规律及对交通、防火等的影响,得出各工况下防止烟气逆流的通风排烟方式。
Taking the Laoyingwo extra-long tunnel on the right bank of Wudongde hydropower station as an example, the influence of jet fan linkage mode and construction branch tunnel as escape passage on delayed flow under fire condition was studied. Using the calculation method of fire network ventilation, the air flow law in tunnel and its influence on traffic and fire prevention of fires in four fire prevention zones were studied respectively. The ventilation and smoke exhaust modes to prevent the reverse flow of smoke under different working conditions were obtained.
作者
陈寿堂
罗欣宇
姚劲松
魏然
马中刚
宛良朋
CHEN Shou-tang;LUO Xin-yu;YAO Jin-song;WEI Ran;MA Zhong-gang;WAN Liang-peng(Changjiang Survey Planning Design and Research Co.,Ltd,Hubei Wuhan 430010,China;China Three Gorges Con struction Management Co.,Ltd,Sichuan Chengdu 610031,China)
出处
《消防科学与技术》
CAS
北大核心
2019年第9期1234-1236,1240,共4页
Fire Science and Technology
基金
中国三峡建设管理有限公司科研资助项目(WDD/0500)
关键词
特长隧道
火灾
施工支洞
射流风机
网络通风计算
烟气逆流
extra-long tunnel
fire
construction branch tunnel
jet fan
calculation on network ventilation
reverse flow of smoke