通过对德阳万达广场高大模板安装工程的安装工艺、支设施工注意事项及模板拆除施工工艺进行总结和分析,得到有效的、具体的施工方案,可为高大模板的推广应用提供一定的技术支持。
Through the installation process of the large formwork installation project of Deyang Wanda Plaza,the construction precautions and the construction technology of the formwork removal are summarized and analyzed,and the effective and specific construction scheme is obtained,which can provide some technical support for the popularization and application of the large formwork.