6Yiliu Tu. Real time scheduling and control of material handing and equipment set-up in automatic shop floorfor one-of-a-kind production[D]. Denmark: University of Aalborg, 1993.
7Lee J K, Lee K J, Park H K, et al. Developing scheduling systems for Daewoo Shipbuilding: DAS project [J]. European Journal of Operational Research, 1997, 97(2):380-395.
8Baek T H, ChungK H, ParkJC. A study on the application of resource leveling heuristic for ship erection scheduling[J]. IE Interfaces, 1999, 12(3) :354-361.
9Park K, Lee K, Park S, et al. Development of bay schedulers for shipbuilding [J]. IE Interfaces, 1995, 8 (2):95-103.
10Koh S G, Park J C, Choi Y S, et al. Development of a block assembly scheduling system for shipbuilding company [J]. IE Interfaces, 1999, 12(4):586-594.