摘要 异形板桥梁桩基主动托换对变形要求严格,托换时顶升力的确定极为重要。异形板桥梁在长期使用过程中,由于混凝土徐变、桩基不均匀沉降等因素,桥梁实际受力与理论计算不一致,通过地面预支顶现场试验测定桥墩的实际受力,并与理论计算进行对比分析以确定顶升力。同时,介绍了托换方案比选、托换结构设计、减小托换沉降的控制措施、主要监测项目及控制值等,托换过程中的全自动化监测结果显示,托换满足设计和工前评估要求。 The active underpinning of the pile foundation of the special-shaped bridge is strict in deformation,and the lifting force during the underpinning is extremely important.During the long-term use of the bridge,due to the factors such as concrete creep and differential settlement of the pile foundation,the actual force of the bridge is inconsistent with the theoretical calculation.The actual force of the pier is measured by the roof support test and compared with the theoretical calculation to determine the lifting force.The comparison and selection of the underpinning scheme,the design of the underpinning structure,the control measures to reduce the subsidence,the main monitoring items and the control values are also introduced.The automated monitoring results in the underpinning meet the design and prior evaluation requirement.
作者 牛斌 NIU Bin(Beijing Urban Construction Design&Development Group Co.,Ltd.,Beijing 100037,China)
出处 《施工技术》 CAS 2019年第23期33-36,49,共5页 Construction Technology
关键词 桥梁工程 桩基础 主动托换 异形板 顶升力 轴力 监测 bridges piles active underpinning special-shaped slab lifting force axial force monitoring
  • 相关文献

参考文献7

二级参考文献49

共引文献143

同被引文献27

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部