摘要
文章首先结合佛山地区的地质特征来分析佛山地铁二号线建设中的主要工程地质问题,然后利用钻探、原位测试、物探、室内试验等勘察技术来研究地铁沿线区域软土、岩石、地表水及地下水的物理力学性质,最后对佛山地铁二号线一期工程设计、施工、监测等提出合理可行的工程措施建议。
This paper first analyzes the main engineering geological problems in the construction of Foshan Metro Line 2 by combining the geological features of Foshan area,and then uses drilling,in-situ testing,geophysical exploration,indoor testing and other exploration techniques to study soft soil,rock,and The physical and mechanical properties of surface water and groundwater,and finally put forward reasonable and feasible engineering measures for the design,construction and monitoring of the first phase of Foshan Metro Line 2.
作者
胡家亮
杨彩香
王颖
HU Jia-liang;YANG Cai-xiang;WANG Ying(Foshan University of Science and Technology,Foshan 528225)
出处
《矿产勘查》
2019年第12期3016-3022,共7页
Mineral Exploration
关键词
地铁工程
盾构施工
工程地质
勘察技术
subway engineering
shield construction
engineering geology
survey technology