施工进度控制是施工管理中较为重要的环节。在军用工程建设过程中,采用网络计划技术对施工进度进行科学、有效的控制极为必要,这也是提升项目施工管理水平的重要措施。基于此,论文对网络技术在施工进度计划管理中的应用及其相关进行了分析,以期为提升军用工程施工管理质量提供参考。
Construction schedule control is an important link in construction management.In the process of military engineering construction,it is necessary to use network planning technology to control the construction progress scientifically and effectively,which is also an important measure to improve the level of project construction management.Based on this,the paper analyzes the application and correlation of network technology in the construction schedule management,so as to provide reference for improving the quality of military engineering construction management.
作者
刘强
郑建国
LIU Qiang;ZHENG Jian-guo(Donghua University,Shanghai 200051,China;Shanghai Astronomical observatory,Chinese Academy of Sciences,Shanghai 200030,China)
出处
《工程建设与设计》
2020年第4期228-229,共2页
Construction & Design for Engineering
关键词
网络计划技术
施工进度控制
进度计划
应用
network planning technology
construction schedule control
schedule of progress
application