期刊文献+

某2×12MW生物质电站烟气脱硝系统改造技术分析

Analysis of Technical Renovation on Flue Gas Denitration System for a Biomass Power Plant of 2×12 MW
下载PDF
导出
摘要 某2×12 MW生物质电站烟气脱硝标准不达标,对其进行系统改造分析,设计改造为差速流化床锅炉,SNCR脱硝系统可不做更换,大大降低投资费用。同时在引风机出口增加1套臭氧脱硝装置或NaClO2/NaClO脱硝装置。对2种脱硝方案的工艺流程及改造经济性等进行对比后,本次脱硝改造推荐采用NaClO2/NaClO脱硝方案。 The targeted biomass power plant with capacity of 2×12 MW was not up to the standard for the flue gas denitration.An analysis of technical renovation on flue gas denitration system was conducted in this paper for the sake of this.The boiler for the plant was transformed into a differential fluidized bed boiler with the SNCR denitration system remaining the same as before which saves a great amount of money for the investment.Along with this,a set of ozone denitration unit or NaClO2/NaClO denitration system was installed at the outlet of the draft.After the comparison on the principles,working processes,cost and investment between the above-mentioned two plans,the plan of NaClO2/NaClO denitration is recommended for this renovation on flue gas denitration program.
作者 彭丹 李玉娜 杜雅琴 PENG Dan;LI Yuna;DU Yaqin(Zhengzhou Electric Power College,Zhengzhou 450002,China)
出处 《能源研究与管理》 2020年第1期47-50,54,共5页 Energy Research and Management
基金 郑州电力高等专科学校校级科研资助项目(ZEPC2019-29)。
关键词 SNCR 臭氧脱硝 NaClO2/NaClO氧化脱硝 SNCR ozone denitration NaClO2/NaClO oxidized denitration
  • 相关文献

参考文献7

二级参考文献43

共引文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部