摘要 为了响应国家产业结构改革的要求,50MW背压式热电联产机组数量逐年增加。某厂一台50MW背压式热电联产机组,在启机过程中振动及胀差波动大,并最终导致转子塑性弯曲、轴封磨损等严重问题。针对上述问题,结合热力分析以及运行经验,从启机过程优化方面提出了相应的整改措施,并制定了一系列的运行控制边界条件。本文对该等级背压机组的启动过程优化具有重要的借鉴意义。 In response to the requirements of the national industrial structure reform,the number of 50 MW backpressure combined heat and power units has increased year by year.A 50MW back-pressure cogeneration unit in a plant has large f luctuations in vibration and expansion during the start-up process,and eventually leads to serious problems such as plastic bending of the rotor and wear of the shaft seal.In view of the above problems,combined with thermal analysis and operational experience,the corresponding rectification measures were proposed from the optimization of the start-up process,and a series of operational control boundary conditions were formulated.This paper has important reference significance for the optimization of the starting process of the back pressure unit.
出处 《科技创新导报》 2019年第31期116-118,共3页 Science and Technology Innovation Herald
基金 浙江省能源集团有限公司科技项目(项目编号:ZNKJ-2019-009)。
关键词 50MW背压机组 启机冲转 汽缸形变 转子弯曲 暖机方式 50MW back pressure unit Starting and turning Cylinder deformation Rotor bending
  • 相关文献

参考文献5

二级参考文献7

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部