摘要
电缆的布放是铁路牵引变电所施工中的重点和难点,体现了变电所施工工艺质量。本文研究通过BIM三维仿真辅助及电缆敷设规划软件直观地完成电缆敷设前的虚拟敷设及调整电缆布设顺序和位置,采用三维线缆信息模型和BIM模型自动生成的报表为施工依据,对施工过程进行有效管理,从而达到提高牵引变电所电缆敷设效率和工艺水平的目的。
The laying of cables is the key point and knotty point for construction of railway traction substation,and it will reflect the quality of the substation construction process.The researches are made on the basis of accomplishing of virtual laying of cables and adjustment of the laying sequence and locations before the actual laying of cables by application of BIM three dimensional simulation assistance and cable laying planning software,and the effective management are implemented to the construction process by application of the reports generated automatically by the three dimensional cable information model and BIM model so as to realize the target to improve the efficiency and process level for laying of cables for traction substation.
出处
《电气化铁道》
2020年第1期85-87,共3页
Electric Railway