期刊文献+

Ⅲ型弹条扣压力测试方法 被引量:4

Measuring Method of Fasten Force of Ⅲ-type Clip
下载PDF
导出
摘要 现有e型弹条扣压力测试有2种方法:通过加载使弹条向下产生一定位移时进行测定(方法1);通过提升使弹条向上产生一定位移时进行测定(方法 2)。分别采用2种方法测试不同安装距离下Ⅲ型弹条的扣压力并分析扣压力与安装距离的关系。结果表明:采用方法 1时安装距离为8,10,20 mm测得的弹条扣压力均满足标准要求,弹条扣压力随安装距离的增大而增大;采用方法 2时安装距离为8,10 mm测得的弹条扣压力满足标准要求,安装距离为20 mm时不满足要求,弹条扣压力随安装距离的增大而减小。采用方法2进行扣压力测试时须严格保证弹条与安装座距离处于8~10 mm。 There are two methods to test the toe load of e-type clip including measuring when the clip has a certain downward displacement through loading(No.1 method) and measuring when the clip has a certain upward displacement through lifting(No.2 method).Two kinds of test methods were used to test the toe load of Ⅲ-type clip under different installation distance,and the relationship between toe load and installation distance was analyzed.The results show that when the installation distance is 8,10 and 20 mm,the toe load of clip measured by No.1 method can meet the standard requirements,and the toe load of clip increases with the increase of installation distance.When the installation distance is 8 and 10 mm,the toe load of clip measured by No.2 method can meet the standard requirements,when the installation distance is 20 mm,the toe load of clip cannot meet the requirements,and the toe load of clip decreases with the increase of the installation distance.It means that the distance between the clip and the installation base must be strictly within the range of 8~10 mm when the toe load test is carried out by No.2 method.
作者 张松琦 张远庆 汝继来 吕明奎 朱继光 ZHANG Songqi;ZHANG Yuanqing;RU Jilai;LYU Mingkui;ZHU Jiguang(Railway Engineering Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China;Beijing Tieke Shougang Rail-Tech.Co.Ltd.,Beijing 102206,China)
出处 《铁道建筑》 北大核心 2020年第4期94-96,共3页 Railway Engineering
关键词 Ⅲ型弹条 扣压力 测试方法 试验研究 安装距离 接触区域 变形量 Ⅲ-type clip toe load test method experimental study installation distance contact area deformation
  • 相关文献

参考文献6

二级参考文献33

  • 1曾召林.Ⅲ型弹条变形强化的研究及实践[J].铁道工程学报,2001,18(3):132-134. 被引量:5
  • 2肖俊恒,赵汝康.弹条扣压件的优化设计与研究[J].中国铁道科学,1995,16(4):42-47. 被引量:16
  • 3肖新标,金学松,温泽峰.钢轨扣件失效对列车动态脱轨的影响[J].交通运输工程学报,2006,6(1):10-15. 被引量:45
  • 4李定清.轮轨垂直相互动力作用及其动力响应[J].铁道学报,1987,9(1):1-8.
  • 5童大埙.铁路轨道[M].北京:中国铁道出版社,1995.
  • 6Jenkins H H.The effect of track and vehicle parameterson wheel/rail vertical dynamic forces[J].RailwayEngineering Journal,1974,3(1):2-16.
  • 7Sun Y Q,Dhanasekar M.A dynamic model for thevertical interaction of the rail track and wagon system[J].International Journal of Solids and Structures,2002,39:1337-1359.
  • 8吴章江,王浦强,李湘敏.车辆通过轨道低扣接头的垂向轮轨作用力计算[J].铁道机车车辆,1982,2(1):24-30.
  • 9Abe N,Fukui Y,Nagafuji T,Ishida M,Miura S.Maintenance of rail welded part by grinding itsirregularities for elongation of rail service life[J].Reportof Railway Technical Research Institute,1994,8(11):17-22.
  • 10肖新标,金学松,温泽峰.轨下支承失效对直线轨道动态响应的影响[J].力学学报,2008,40(1):67-78. 被引量:24

共引文献80

同被引文献28

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部