摘要
装配式是中小学校类建筑逐渐广泛采用的建造方式,其前期策划方法与传统建造方式不完全相同。本文结合装配式中小学校建筑设计实践工作,采用AHP法进行科学决策和量化评价,研究并探索在一体化建造方式中以设计为核心的前期策划方法,为装配式建筑的发展和完善提供了新的思路。
Assembly is a widely used construction method for the buildings in primary and secondary schools.Its preliminary planning method is not the same as the traditional construction method.Combined with the architectural design practice of prefabricated buildings in primary and secondary schools,this paper uses AHP method for scientific decision-making and quantitative evaluation.This paper studies and explores the preliminary planning method of the design-oriented integrated buildings,which provides new ideas for the development and improvement of prefabricated buildings.
作者
杨曦
李文
Yang Xi;Li Wen(China Construction Prefabricated Building Design&Research Institute Co.,Ltd,Beijing 100195,China)
出处
《城市建筑》
2020年第5期82-85,共4页
Urbanism and Architecture
基金
国家“十三五”6.6.3(2016YFC0701903)。
关键词
装配式
设计
中小学校建筑
前期策划
prefabricated buildings
design
primary and secondary school buildings
preliminary planning