摘要
随着BIM技术的大力发展,水电站设计行业正处在从二维设计向三维设计变革的时期,三维设计可采用多专业协同设计,对于解决传统二维出图容易出现的错、漏、碰、缺等问题有极大帮助,并可开发材料表统计等二次开发插件进一步提升设计效率。文章基于CATIA三维设计软件,对水电站水机专业三维设计基本流程做了介绍,并对其中需注意的地方进行了分析。
With the development of BIM Technology,the design industry of hydropower station is in the period of transformation from two-dimensional design to three-dimensional design.Three-dimensional design can adopt multi-disciplinary collaborative design,which is of great help to solve the problems such as errors,omissions,collisions and deficiencies that are easy to occur in traditional two-dimensional drawing,and can develop secondary development plug-ins such as material table statistics to further improve the design efficiency.Based on CATIA 3D design software,this paper introduces the basic process of 3D design for hydraulic machinery specialty of hydropower station,and analyzes the key points in the design.
作者
王子瑞
周虎
段宏江
WANG Zirui;ZHOU Hu;DUAN Hongjiang(PowerChina Northwest Engineering Corporation Limited, Xi'an 710065,China;The Yellow River Lijiaxia Power generation branch Corporation, Kanbula 811999,China)
出处
《西北水电》
2020年第2期86-88,92,共4页
Northwest Hydropower