摘要
煤矿高位钻场传统施工方式,存在掘进工程量大,劳动强度大,支护困难等问题。童亭煤矿积极探索优化高位钻场掘进施工工艺,提高高位钻场施工效率,为类似煤矿工程的应用具有一定借鉴意义。
The traditional construction method of coal mine high-level drilling site has the problems of large amount of digging engineering,high labor intensity,and difficult support.Tongting Coal Mine actively explores and optimizes the construction technology of high-level drilling site and improves the efficiency of high-level drilling site construction.
作者
李景润
LI Jingrun(Huaibei Mining(Group)Co.,Ltd.,Tongting Coal Mine,Huaibei Anhui 235137)
出处
《智能建筑与工程机械》
2019年第5期47-49,共3页
Intelligent Building and Construction Machinery
关键词
高位钻场
施工工艺
掘进
high-level drilling field
construction technology
dig