加快长三角地区动车设施规划建设研究 被引量:2

Research on Accelerating the Planning and Construction of EMU Facilities in Yangtze River Delta Region
下载PDF
导出
摘要 随着长三角地区高速铁路建设进程加快,动车组开行对数快速增长,动车组存放、运用检修能力日趋紧张。在分析长三角地区既有动车检修设施现状、存在问题基础上,结合长三角地区铁路网规划、建设及2020年、"十四五"期间动车组预测配属数量和检修需求,依据动车设施布局规划原则,提出长三角地区动车设施规划建设方案和推进建议,为发挥铁路网整体功能、提高效益提供参考。 Amid the accelerated construction of high speed railways in the Yangtze River Delta region and the rapid increase in the number of running EMU trains,EMU storage,operation and maintenance capabilities are increasingly inadequate.The paper first analyzes the current situation and challenges of existing EMU maintenance facilities in the Yangtze River Delta region.In light of the railway network planning in this region and the EMU estimated allocation quantity and maintenance requirements in 2020 and during the"14 th FiveYear Plan"period,as well as the principle of EMU facility layout,the paper then puts forward the EMU facilities planning and construction scheme in the Yangtze River Delta region and corresponding implementation suggestions,in a bid to fulfill the overall function and improve efficiency of railway network.
作者 宋飞 沈维 SONG Fei;SHEN Wei(China Railway Shanghai Group Co Ltd,Shanghai 200071,China)
出处 《中国铁路》 2020年第5期81-86,共6页 China Railway
关键词 长三角地区 动车设施 规划建设 Yangtze River Delta region EMU facilities planning and construction research
  • 相关文献

参考文献4

二级参考文献16

共引文献98

同被引文献14

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部