摘要
文章简述了现阶段国内桥梁工程施工中现灌浇盖板梁的支撑架的设计理念、施工时的重要注意条款、组装整体结构时一定要注意的问题及作业顺序。支撑架搭建完成以后,还需要进行预先施加载荷(压力)的试验,以此来验证支撑架的压缩量是否达标及结构稳定性。
This paper briefly describes the design concept of the support frame of cast-in-place cast-in-place slab beam in domestic bridge construction at the present stage,the important items to be paid attention to in construction,the problems that must be paid attention to when assembling the whole structure and the operation sequence.After the construction of the support frame,the pre-load(pressure)test needs to be carried out to verify whether the compression amount of the support frame is up to the standard and the structural stability.
出处
《科技创新与应用》
2020年第19期86-87,共2页
Technology Innovation and Application
关键词
简易支撑桥梁
灌浇盖板
支撑架
simple supporting bridge
pouring cover plate
support frame