结合工程实例,介绍在东南沿海地区的恶劣地质条件下,对地基进行处理,完成桩基、围护施工。通过地基处理、设计方案优化、桩机及配重的选型、桩机行走路线、对基坑边坡加固等几个方面的处理,解决强流塑地质对地下结构施工造成的影响。
Combined with the engineering example,this paper introduces the treatment of the foundation and the completion of pile foundation and enclosure construction under the adverse geological conditions in the southeast China coastal area.Through the treatment of foundation treatment,optimization of design scheme,selection of pile machine and counterweight,walking route of pile machine and reinforcement of foundation pit slope,the influence of strong current plastic geology on underground structure construction is solved.
作者
孙昭
SUN Zhao(Shanghai Construction No.5(Group)Co.Ltd.,Shanghai 200063,China)
出处
《工程建设与设计》
2020年第11期244-247,共4页
Construction & Design for Engineering
关键词
淤泥层
预制管桩
围护施工
silt layer
precast tubular pile
enclosure construction