摘要
文章以某工程为例,详细阐述了该工程的挂篮设计,并对挂篮施工技术及关键点管控以及合龙段的施工展开了详细的探讨,保证了该工程的整体质量。
The article takes a certain project as an example to elaborate the hanging basket design of the project,and discusses the construction technology and key points of the hanging basket and the construction of the Helong section in detail to ensure the overall quality of the project.
作者
程学芳
CHENG Xuefang(NO.4 Engineering Corporation Limited of CR20G,Qingdao 266100,China)
关键词
双线铁路
连续箱梁
挂篮施工
double-track railway
continuous box beam
hanging basket construction