5Al-HUSSEI N M.Anintegrated systemfor crane selection and utilization. . 1999
6ZHANG P,HARRIS F C,OLOMOLAIYE P O,et al.Location opti mizationfor a group of tower cranes. Constr Eng Manage . 1999
7Al-HUSSEI N M,ATHAR MN,YU K.Integrating3Dvisualization and si mulationfor tower crane operations on construction sites. Automationin Construction . 2005
8TANTISEVI K,AKI NCI B.Si mulation-basedidentification of possible locations for mobile cranes on construction sites. Journal of Computing in Civil Engineering . 2008
9Al-Hussein M,Alkass S,Moselhi O.Optimization algorithm for selection and on site location of mobile cranes. Construction Engineering and Management . 2005
10Lin K L,Haas C T.Muttiple heavy lifts optimization. Construction Engineering and Management . 1996