期刊文献+

深水钻井井喷事故风险控制决策方法 被引量:9

Research on risk control decision method for deepwater drilling blowout
原文传递
导出
摘要 为有效降低深水钻井井喷事故风险,提出一种井喷事故风险控制决策定量评估方法。首先运用贝叶斯网络(BN)建立深水钻井井喷事故评估模型,根据BN网络前向和后向推理原则,确定井喷事故的主要风险因素和发生概率;然后针对导致井喷事故发生的风险因素提出5项风险控制措施,考虑执行风险决策的效用和成本,通过增加效用节点和成本节点,建立深水钻井井喷事故风险控制决策模型,定量评估31项风险决策措施的有效性和总成本。研究结果表明:执行加强人员技能培训和增加功能测试与维护决策的总成本较低,同时可将深水钻井井喷事故风险控制在可接受风险区域。 In order to reduce blowout accidents in deepwater drilling,a quantitative assessment method of risk control decision is put forward.Firstly,an assessment model for blowout accidents in deepwater drilling was established by using BN,and based on forward and backward reasoning principles of BN,major risk factors and occurrence probability were determined.Then,five risk control measures were proposed targeting at risk factors.Finally,a risk control decision model was constructed by adding utility node and cost node,and effectiveness and total cost of 31 decision-making measures were evaluated quantitatively.The results show that decision implementation of strengthening personnel skills training and increasing functional testing and maintenance costs lower,and can also help control blowout risk in an acceptable range.
作者 朱敬宇 陈国明 吕寒 孟祥坤 智晨潇 周丽晨 ZHU Jingyu;CHEN Guoming;LYU Han;MENG Xiangkun;ZHI Chenxiao;ZHOU Lichen(Centre for Offshore Engineering and Safety Technology,China University of Petroleum,Qingdao Shandong 266580,China)
出处 《中国安全科学学报》 CAS CSCD 北大核心 2020年第2期113-118,共6页 China Safety Science Journal
基金 国家重点研发计划(2017YFC0804501.2016YFC0304005)。
关键词 深水钻井 井喷事故 风险控制 贝叶斯网络(BN) 影响图(ID) deepwater drilling blowout accidents risk control Bayesian network(BN) influence diagram(ID)
  • 相关文献

参考文献6

二级参考文献74

  • 1Xiali Haer, Midori Inaba, Kenji Tanaka. A study on human error in a blowout accident in well operation[_A]. Memoir of SICE Annual Conference 2008[ C] ,2010:2 012 - 2 017.
  • 2MA Qing-chun, ZHANG Lai-bin. Accident simulation on high sulfur natural gas well blowout[A]. Memoir of 2010 Second International Conference on Computer Modeling and Simulation[C] ,2010:1 109 -1 114.
  • 3王萁藩.系统动力学[M].北京:清华大学出版社,1994.3-5.
  • 4The Bureau of Ocean Energy Management, Regulation and Enforcement(BOEMRE), U.S. Coast Guard. Report Re- garding the Causes of the April 20, 2010 Macondo Well Blowout. [ EB/OL]. 2011 -09 - 14.
  • 5Skalle P, Podio A L. Trends Extracted from 800 Gulf Coast Blowouts during 1960 - 1996 [ C ]. IADC/SPE 39354.
  • 6Anderson L B. Stochastic Modeling for the Analysis of Blowout Risk in Exploration Drilling[ J]. Reliability Engi- neering and System Safety, 61(1998). 53 -63.
  • 7Bercha F Get al. Probabilities of Blowout in Canadian Arctic Waters, Canadian Environmental Impact Control Directorate, Report No. EPS 3 - EC -78 - 12, 1978.
  • 8API. API RP 65 -2 -2010 Isolating Potential Flow Zones during Well Construction First Edition[ S]. 2010.
  • 9McAndrews K L. Consequences of Macondo: A Summary of Recently Proposed and Enacted Changes to US Offshore Drilling Safety and Environmental Regulation [ J ]. SPE 143718.
  • 10Sklet, S. Safety barriers: definition, classification, and performance [ J ]. Journal of Loss Prevention in the Process Industries, 2006, 19 (5) : 494-506.

共引文献93

同被引文献66

引证文献9

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部