摘要
为解决传统梁场施工效率低、耗能高、安全质量不易得到保证的问题,预制梁场借助BIM、物联网、智能传感等科技手段,采用“1个平台+3套系统”的信息化模式,通过数据接口开发,基于BIM管理平台集成多套智能化生产系统,成功打造了深中通道项目S07合同段中山智慧梁场,并支持客户端、手机端、网页端三端协同工作,实现了梁场生产过程可视化、施工流程标准化、业务管理数字化、机械设备智能化、管理决策智慧化的目标。同时,梁场BIM信息化的建造进一步推动了国内桥梁工程预制装配式技术的发展。
In order to solve the problems of low construction efficiency,high energy consumption and low safety quality faces by many traditional girder prefabrication field,the authors of the paper applies BIM,Internet of Things,intelligent sensor and other scientific and technological means in their girder prefabrication field.An information mode of"one platform+three systems"is adopted to integrate multiple intelligent production systems based on BIM management platform through data interface development,which has successfully built the intelligent girder prefabrication field in Zhongshan for the contract section S07 of Shenzhen-Zhongshan bridge project,supporting the collaborative work of the client end,mobile end and Web end.The intelligent girder prefabrication field realizes the goals of visualization of manufacture progress of girder prefabrication,standardization of construction process,digitalization of business management,intellectualization mechanical equipment,and intellectualization of management decision.Meanwhile,the construction of BIM informatized girder prefabrication field has further promoted the development of prefabricated technology of bridge engineering in China.
作者
张迎松
梁海文
陶建山
陈剑波
刘佩斯
Zhang Yingsong;Liang Haiwen;Tao Jianshan;Chen Jianbo;Liu Peisi(China Railway Bridge Bureau Group Co.,Ltd.,Wuhan 430050,China)
出处
《土木建筑工程信息技术》
2020年第2期55-61,共7页
Journal of Information Technology in Civil Engineering and Architecture
关键词
BIM技术
预制梁场
解决方案
信息化
装配式技术
BIM Technology
Girder Prefabrication Field
Solutions
Informationization
Fabrication Technology