±1100 kV特高压直流输电线路工程铁塔组立方案分析 被引量:1

Tower Erection Scheme for±1100kV UHVDC Transmission Line Engineering
下载PDF
导出
摘要 昌吉-古泉±1 100 kV特高压直流输电工程组塔施工中,需解决塔材运输及堆放、进场道路、平行带电线路和超长超重构件吊装等一系列问题。从铁塔的特点出发,结合工程实际,介绍了5种特高压铁塔的组立方法。通过对组塔方案和施工效率进行分析后,对施工用小工具的研制和施工方法进行了创新。 During the tower construction of Changji-Guquan±1100kV UHVDC transmission project,a series of problems,such as tower material transportation and stacking,approach roads,hoisting of parallel live lines and ultra-long and overweight components,should be solved.Based on the characteristics of the tower and combined with the engineering practice,five schemes of UHV tower construction are introduced.After analyzing the construction efficiency of the schemes,the small construction tools and construction methods are are innovated.
作者 韩启云 单长孝 汪以文 关绍峰 HAN Qiyun;SHAN Changxiao;WANG Yiwen;GUAN Shaofeng(Anhui Electric Power Transmission&Transformation Co.,Ltd.,Hefei 230022,Anhui Province,China)
出处 《电力与能源》 2020年第3期308-311,320,共5页 Power & Energy
基金 国家重点建设工程项目(发改能源[2015]3112号)。
关键词 ±1100 kV特高压直流输电工程 铁塔组立 电力工程 ±1100kV UHVDC transmission project tower assembly power engineering
  • 相关文献

参考文献12

二级参考文献48

共引文献46

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部