摘要
在地铁车站基坑施工过程中,为了保障工程安全,采用自动化监测手段对基坑进行实时变形监测。本文介绍了自动化监测系统在沈阳市新建地铁九号线北二路车站基坑监测中的使用。从监测网布置、测量方法、监测结果分析几个方面较详细的说明了自动化监测方法在指导基坑施工进行的方法和过程,为相似工程的变形监测提供借鉴和参考。
In the construction process of subway station foundation pits,in order to ensure the safety of the project,the real-time deformation monitoring of the foundation pits is carried out by using automatic monitoring methods.This article introduces the use of the automatic monitoring system in the foundation pit monitoring of the Beier Road Station of the new Metro Line 9 in Shenyang.From the aspects of monitoring network layout,measurement methods and analysis of monitoring results,the method and process of automatic monitoring method in guiding the construction of foundation pits are explained in detail,which provides reference for deformation monitoring of similar projects.
作者
张春节
魏力
王欢
ZHANG Chun-jie;WEI Li;WANG Huan(Beijing Municipal Construction Group Co.,Ltd.,Beijing 100045,China)
出处
《价值工程》
2020年第22期216-217,共2页
Value Engineering
关键词
自动化监测
基坑施工
监测网布置
位移
automatic monitoring
foundation pit construction
monitoring network layout
displacement