北京轨道交通机场线二期(西延)北新桥站的附属结构毗邻既有5号线西南出入口,最小水平距离仅0.5 m。施工中采用调整施工顺序,超前注浆加固止水,背后回填注浆等措施,有效控制了结构变形和沉降。
The accessory structure of Beixinqiao station of Beijing capital airport rail transition line phase II(west extension)is adjacent to the southwest entrance of subway line 5 and the minimum horizontal distance between them is only 0.5 m.Some measures were adopted,such as adjustment of construction sequence,advanced grouting strengthening water-stopping and behind backfill grouting,etc.,to effectively control structure deformation and settlement.
作者
李春茂
王伟
王振辉
LI Chun-mao;WANG Wei;WANG Zhen-hui(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处
《建筑技术》
2020年第7期786-788,共3页
Architecture Technology
关键词
非降水开挖
既有线路
深孔注浆
non-dewatering excavation
existing lines
deep-hole grouting