摘要
高铁线路所通常设置在铁路区间正线与联络线、疏解线或其他特定线路的交汇处或分离处,部分线路所采用单独设置列控中心、计算机联锁系统的方式。针对线路所侧线通过进路与邻站进站信号机之间采用红灯重复原则的情况进行分析,介绍计算机联锁与列控中心系统对此场景的特殊设计方法。
The block post of high-speed railway is usually set at the intersection or separation between main line of the railway section and the connecting line,untwining line or other specific lines.Some block posts adopt the method of separate setting of train control center(TCC) and computer interlocking system.This paper analyzes the situation in which the principle of red light repetition used between siding through route of block post and adjacent entrance signal.This paper also introduces special design method of computer interlocking and TCC system for above scene.
作者
胡井海
马樱
蔡微微
Hu Jinghai;Ma Ying;Cai Weiwei(CASCO Signal Ltd.Beijing 100070,China)
出处
《铁路通信信号工程技术》
2020年第8期94-96,共3页
Railway Signalling & Communication Engineering
关键词
红灯重复
冒进信号
发码
red light repetition
overrun a signal
coding