摘要
以长距离工作面贯通测量为对象开展探究,结合具体工程实际,在开展井下测量设计分析的基础上,对贯通作业方案进行全面分析研究,并对测量结果和贯通精度做出分析,希望能够为其他矿井相似工程的开展提供借鉴和参考。
This paper exploree the penetration surveying in long-distance working face.Combined with the actual engineering,on the basis of the underground surveying design and analysis,it conducted a comprehensive analysis and research on the penetra-tion operation scheme,and analyzed the surveying results and penetration accuracy,hoping to provide reference for the develop-ment of similar projects in other mines.
作者
裴亚东
PEI Yadong(Xiegou Coal Mine,Xishan Jinxing Energy Co.,Ltd.of Shanxi,Xingxian 033600,Shanxi,China)
出处
《能源与节能》
2020年第8期127-128,共2页
Energy and Energy Conservation
关键词
矿井
长距离工作面
贯通测量
精度分析
mine
long-distance working face
penetration surveying
accuracy analysis