某铅锌矿人工隔离矿柱厚度优化设计 被引量:2

Optimization Design for the Thickness of Artificial Barrier Pillar in A Lead-Zinc Mine
下载PDF
导出
摘要 隔离矿柱是矿山地下开采浅部转深部开采的衔接部分,通过留设隔离矿柱,可为浅部空区处理与深部采矿方法变更提供条件。利用FLAC 3D软件对不同厚度人工隔离矿柱进行稳定性分析,确定了最佳人工隔离矿柱厚度。对类似矿山资源回收及安全生产具有一定的参考和借鉴意义。 Barrier pillar is the connecting part of the underground mining from shallow to deep.By reserving the barrier pillar,it can provide conditions for the shallow goaf treatment and the deep mining method change.In this paper,FLAC 3D software is used to analyze the stability of different thickness of artificial barrier pillars,and the optimal thickness of artificial barrier pillars is determined.It has certain reference and reference significance for similar mine resource recovery and safe production.
作者 朱明 刘吉祥 刘友龙 苏成哲 ZHU Ming;LIU Ji-xiang;LIU You-long;SU Cheng-zhe(Lanzhou Engineering&Research Institute of Nonferrous Metallurgy Co.Ltd.,Lanzhou 730000,China)
出处 《甘肃冶金》 2020年第4期9-10,15,共3页 Gansu Metallurgy
关键词 采空区处理 隔离矿柱 数值模拟 稳定性分析 processing methods of mined-out area insulating pillar numerical simulation stability analysis
  • 相关文献

参考文献6

二级参考文献65

共引文献92

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部